Download a Monthly QA Report

The Oklahoma Mesonet's quality-assurance (QA) consists of four principal components:
1) laboratory calibration,
2) on-site intercomparison,
3) automated QA, and
4) manual QA.

In the instrument laboratory, all sensors are calibrated to validate or improve upon factory calibrations.

On an annual basis, the accuracy of several types of sensors in the field is verified through comparison to calibrated reference sensors housed in a portable system.

To make a first pass through the 640,000+ observations that are received at the Mesonet each day, automated QA software includes numerous algorithms to evaluate the data received from remote stations.

Finally, the Mesonet’s QA meteorologists employ numerous manual techniques to complement automated QA including analysis of monthly statistics to detect sensor drift or bias (click on a month and year to the left to download a PDF version of a Monthly Report). In addition to detecting problematic sensors, the QA meteorologists trace the true start time of each problem so that appropriate data can be manually flagged as erroneous. The QA meteorologists are responsible for communicating problems to, and coordinating with, appropriate field technicians to ensure proper resolution (see a list of the current outstanding tickets below).

Current Trouble Tickets in the Oklahoma Mesonet
(For questions regarding these tickets, contact qamgr@mesonet.org)

Station Variable Date Reported Problem Description
Alva TA9M 07-Oct-2009 19:10 SCHEDULED ROTATION.
Alva WSPD 07-Oct-2009 19:14 SCHEDULED ROTATION.
Arnett TS05 05-Nov-2009 11:59 Monthly QA indicated that TS05 has developed ~1deg C low bias.
Beaver PRES 07-Oct-2009 19:15 SCHEDULED ROTATION.
Beaver TA9M 07-Oct-2009 19:16 SCHEDULED ROTATION.
Beaver WSPD 07-Oct-2009 19:17 SCHEDULED ROTATION.
Boise City PRES 07-Oct-2009 19:19 SCHEDULED ROTATION.
Boise City TA9M 07-Oct-2009 19:19 SCHEDULED ROTATION.
Boise City WSPD 07-Oct-2009 19:20 SCHEDULED ROTATION.
Breckinridge TA9M 07-Oct-2009 19:21 SCHEDULED ROTATION.
Breckinridge WSPD 07-Oct-2009 19:22 SCHEDULED ROTATION.
Butler WS2M 07-Oct-2009 19:24 SCHEDULED ROTATION.
Camargo PRES 07-Oct-2009 19:25 SCHEDULED ROTATION.
Camargo TA9M 07-Oct-2009 19:26 SCHEDULED ROTATION.
Chandler TA9M 06-Oct-2009 21:58 SCHEDULED ROTATION.
Chandler WS2M 06-Oct-2009 21:59 SCHEDULED ROTATION.
Cloudy RAIN 15-Nov-2009 22:10 Rain gauge did not report precipitation despite radar showing precipitation moving over site and small increase in soil moisture.
Erick TA9M 13-Oct-2009 17:00 TA9M has over a 1.5 C low bias during extended periods of high humidity.
Eufaula TAIR 18-Sep-2009 09:11 Sensor develops a high bias during extended periods of moist air. Data flagged on as-needed basis.
Eufaula TS05 05-Nov-2009 13:36 Monthly QA indicates that TS05 has developed a low bias. Please bath test TS05 and TS10.
Fairview WSPD 07-Oct-2009 19:29 SCHEDULED ROTATION.
Hinton PRES 07-Oct-2009 20:13 SCHEDULED ROTATION.
Hinton TA9M 07-Oct-2009 20:14 SCHEDULED ROTATION.
Hinton WS2M 07-Oct-2009 20:15 SCHEDULED ROTATION.
Hinton WSPD 07-Oct-2009 20:14 SCHEDULED ROTATION.
Kenton TA9M 07-Oct-2009 20:24 SCHEDULED ROTATION.
Lahoma RELH 07-Oct-2009 20:29 SCHEDULED ROTATION.
Mangum TA9M 07-Oct-2009 21:04 SCHEDULED ROTATION.
May Ranch TA9M 07-Oct-2009 20:30 SCHEDULED ROTATION.
May Ranch WS2M 07-Oct-2009 20:31 SCHEDULED ROTATION.
May Ranch WSPD 07-Oct-2009 20:30 SCHEDULED ROTATION.
Marshall RELH 07-Oct-2009 20:33 SCHEDULED ROTATION.
Okemah TA9M 06-Oct-2009 21:13 SCHEDULED ROTATION.
Seiling TS10 02-Nov-2009 15:38 Please verify serial numbers for TB05, TB10, TS05, TS10 during next site visit.
Slapout TA9M 07-Oct-2009 20:36 SCHEDULED ROTATION.
Slapout WSPD 07-Oct-2009 20:36 SCHEDULED ROTATION.
Stigler TA9M 06-Oct-2009 21:29 SCHEDULED ROTATION.
Tipton SRAD 07-Oct-2009 21:10 SCHEDULED ROTATION.
Watonga PRES 07-Oct-2009 20:37 SCHEDULED ROTATION.
Woodward TA9M 07-Oct-2009 20:40 SCHEDULED ROTATION.
Woodward WS2M 07-Oct-2009 20:41 SCHEDULED ROTATION.
Woodward WSPD 07-Oct-2009 20:40 SCHEDULED ROTATION.